Wednesday 30 November 2011

Patch for Revision of Interest Rates and Various Changes in SB Rulings (w.e.f. 01/12/2011)

IMPORTANT INFORMATION

•             The patch can be executed only after day-end of 30/11/2011
•             It can be executed on the server or on any one of the client systems running a 32 bit Operating system in which DBAnalyzer is installed
•             The patch does not require SQL ‘SA’ password for execution and hence can be run by any official working on systems or by the supervisor
•             Supervisor has to ensure the execution of the patch before commencing counter operations on 01/12/2011.
The patch does NOT incorporate the following points, and hence and in cases where it becomes applicable the changed rule has to be implemented manually.
•             The maturity period for Monthly Income Scheme (MIS) and National Savings Certificate (NSC) will be reduced from 6 years to 5 years – problem will not arise at present.
•             New NSC instrument, with maturity period of 10 years introduced is to be handled manually.
•             The change in rate of interest in case of TD premature closure will have to be done manually till the requisite changes are made.

INSTRUCTIONS FOR RUNNING THE PATCH
•             Download the ‘MoF_RateChange.zip’, unzip and copy it to the DBAnalyzer folder
•             Run ‘MoF_RateChange.exe’ from the DBAnalyzer folder itself.
•             Enter the name of the SB Server and click ‘OK’.
•             A message will be displayed for each scheme.
•             Continue clicking on ‘OK’ until the message ‘Interest rates updation completed successfully’ is displayed.
•             In case any other message or error code is displayed, email the error code to SDC for solution.

0 comments:

Post a Comment